291072.jpg) Category: New Parking Structure Projects Industry: Casino Location: Bethlehem, Pennsylvania
Project Owner: Sands Bethworks Gaming LLC
Architect: RTKL
Contact Info: Frank Devlin
Assignment: Design Build
Size: 1,100,000 Square Feet
Capacity: 3,200 Cars
Value: $40,000,000
Start Date: Summer 2008
Date of Completion: Winter 2009
Project Description: Comprised of 9.5 million pounds of steel, the frame of the garage will be galvanized for corrosion protection. The structure supporting the concrete decks will consist of castellated beams - hybrid girders that offer superior load bearing qualities while requiring less steel per lineal foot.
Winthrop University HospitalCategory: New Parking Structure Projects Industry: Hospital Location: Mineola, New York
Project Owner: Winthrop University Hospital
Architect: McGuire Group
Contact Info: Dan Abruzzese
Assignment: Design Build
Size: 216,000 Square Feet
Capacity: 700 Cars
Value: $17,300,000
Start Date: Winter 2008
Date of Completion: Fall 2009
Project Description: Carl Walker Construction Group will add three (3) additional floors to Winthrop's existing parking structure. The verticle addition will consist of three (3) post-tensioned, cast-in-place concrete decks supported by a steel frame.
.jpg) Category: New Parking Structure Projects Industry: Casino Location: Washington, PA
Project Owner: Millenium Group
Architect: Climans Green Liang
Contact Info: Tim Jones, LPCiminelli
Assignment: Design Build
Size: 327,000 Square Feet
Capacity: 1,000 Cars
Value: $13,600,000
Start Date: Spring 2008
Date of Completion: Spring 2009
Project Description: It will incorporate a pre-stressed, pre-cast concrete frame and cast-in-place deck surfaces. The new garage will join the casino at a shared column line, and will feature a firewall separating the two structures.
2008
 Category: New Parking Structure Projects Industry: Government Location: Pittsburgh, PA
Project Owner: Urban Redevelopment Authority of Pittsburgh
Architect: Indonvina Associates
Type of Assignment: Design/Build
Capacity: 726 cars
Value: $10.5 million
Start Date: Winter 2008
Date of Completion: Fall 2008
Project Description: View News Release
2007
 Category: New Parking Structure Projects Industry: University Location: Erie, PA
Project Owner: Penn State University
Architect: Weber Murphy Fox, Mr. Dennis Wilkins, Erie, PA (814-836-1616)
Contact Info: Mr. Bruce Rohrbach. (814-777-3790)
Assignment: Design/Bid/Build
Size: 52,560 sq. feet
Capacity: 180 cars
Value: $4 million
Start Date: Summer 2006
Date of Completion: Fall 2007
Project Description: The project consists of a two- and one-half (2-1/2) level (grade and 1-1/2 levels), precast concrete parking structure. The structure features a glass tower stair/elevator enclosure and the extensive use of masonry facade treatments. The project will consist of 52,560 sq. ft. of area (24,000 sq. ft. on grade) and provide 165 parking spaces. The project is intended to service a new technology park affiliated with the university.
View Case Study
 Category: New Parking Structure Projects Industry: Government Location: Washington, PA
Project Owner: Mr. Bob Griffin, Redevelopment Authority, Director of Construction Management of the County of Washington (RACW), (724) 228-6875
Architect: Mr. Rob Indovina, Indovina Associates Architects, (412) 363-3800
Value: $11,795,809
Start Date: Spring 2006
Date of Completion: Spring 2007
CWC Contract: $11,795,809
Project Description: This 250,000 sq. ft. (180,000 sq. ft. supported), precast concrete parking structure is intended to provide 850 parking spaces to support a major multi-use downtown redevelopment project for the city of Washington, PA central business district. Significant architectural design features include the use of brick-faced panels at prominent locations and expansive use of glass in the stair elevator towers. Carl Walker Construction (CWC) was awarded the project on a design/build basis through a formal competition that evaluated proposals on a two-part evaluation: 1) how effectively defined design criteria were met and 2) price. Points were awarded on an equal-weight basis for each category, with the project awarded to the proposal with the most total points. CWC won both categories and was awarded the project.
View Case Study
View Video
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Project Owner: McCaffrey Interests
Contact Info: Ethnie Richardson (703) 351-9500
Assignment: Retaining Wall Installation
Value: $2.2 Million
Date of Completion: Fall 2007
Project Description: This assignment entailed installation of a steel, king-pile retaining wall along the bank of the Allegheny River. The wall provides support for the River Walk, which allows Cork Factory residents direct access to the picturesque riverbank. The wall also protects the site from erosion and flooding. The structure is an integral component of a new marina complex that is currently under construction.
View Video
 Category: New Parking Structure Projects Industry: Hospital Location: Morgantown, WV
Project Owner: West Virginia University Hospitals
Architect: type 2
Contact Info: Josh Clavis (304) 598-4125
Assignment: Vertical expansion of garage
Type of Assignment: Design/build
Capacity: 355 cars
Value: $2 Million
Date of Completion: Summer 2007
Project Description: This assignment entailed the addition of a steel post-tensioned parking level to an existing precast parking structure at Ruby Memorial Hospital. The additional level added 105 cars to the garage’s capacity, and required extensive strengthening of the existing structure to support the incremental load. Once the structure of the precast garage was augmented with support members tied in to the original grade beams, the steel components were added to create the new parking level. All steel surfaces were sheathed in precast covers to visually integrate the newly constructed level with the existing structure. The garage was kept open during construction activities to support the needs of the hospital.
View Case Study
Read Article in Modern Steel Construction
Walden Galleria - The EATery - Parking StructureCategory: New Parking Structure Projects Industry: Commercial Location: Cheektowaga (Buffalo), NY
Contact Info: Mr. Roy Brunner, Pyramid Management Group, Inc., Syracuse, NY, (315) 657-1123
Value: $6,900,000
Date of Completion: Fall 2007
Contract Award Date: January 2007
% of Cost of Work Performed With CWC Forces: 20%
Project Description: The project consists of a 963-car, 5-level, 270,000 sq. ft. design/build precast parking structure (400 spaces on grade) in conjunction with the redevelopment of Walden Galleria as a lifestyle center.
2006
The Landings at HarborsideCategory: New Parking Structure Projects Industry: Commercial Location: Perth Amboy, New Jersey
Size: 3 level, 83,000 SF substructure
Capacity: 117 spaces
Value: $600,000
Date of Completion: Spring 2006
 Category: New Parking Structure Projects Industry: Government Location: Fairmont, WV
Project Owner: City of Fairmont, WV, Jay Rogers (304) 367-0490
Architect: Omni Associates, Steve Barnum (304) 367-1417
Value: $3,500,000
Start Date: Summer 2005
Date of Completion: Spring 2006
Engineer: Stroud, Pence & Associates, Ed Pence
CWC Contract: $3,500,000
% of Cost of Work Performed With CWC Forces: 10%
Project Description: The project is a 3-level (grade plus 2 supported levels), pre-cast concrete parking structure which provides 225 parking spaces. The project has approximately 50,000 sq. ft. of structural area and an additional 20,000 sq. ft. of area on grade for a total area of approximately 70,000 sq. ft. The project entailed extensive use of thin-set brick panels and expansive glass in the main stair/elevator enclosure as its primary architectural features.
 Category: New Parking Structure Projects Industry: Government Location: Pittsburgh, PA
Architect: Indovina Associates Architects, Brian Roth, (412) 363-3800 and Rob Indovina, (412) 363-3800
Value: $15,000,000
Start Date: Fall 2005
Date of Completion: Fall 2006
Construction Manager: Zambrano Corporation, Brad Smith, (412) 968-5400
CWC Contract: $2,670,000
Project Description: The project consisted of a new exhibit area for polar bears, walruses and sea otters with adjacent facilities for related equipment and support staff. CWC work included providing the CIP concrete structural frame for the enclosure buildings and the concrete pools, tanks and perimeter walls for the exhibit area and adjacent facilities. Architectural finishes are by others. Scope of work consists of 14,000 sq. ft. of supported structural area, 53,000 sq. ft. of perimeter wall area, plus various tanks and pools.
 Category: New Parking Structure Projects Industry: Hospital Location: Pittsburgh, PA
Project Owner: Medical Center, Bill Barrett, (412) 469-7090 and Steve Kelly, (412) 469-7155
Architect: WTW Architects, Bill Fullerton, (412) 321-0551 x 512
Value: $8,319,432
Start Date: Fall 2005
Date of Completion: Fall 2006
Engineer: Churches Consulting Engineers, Chuck Churches, (724) 663-5522
CWC Contract: $8,740,000
% of Cost of Work Performed With CWC Forces: 10 - 20%
Project Description: The project consists of a 5-level (grade plus 4 supported levels) CIP, P/T concrete parking structure to accommodate 535 parking spaces. Architectural metal panels are used for the facade treatment. The project is constructed on an existing surface parking lot on a hilltop behind the hospital complex. The work also included the construction of a new access road from a lower parking lot 50? + below.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Project Owner: McCaffery Interests, Chicago, IL
Contact Info: Construction Manager: Plant Construction, Mr. Craig Allison (415) 281-0686
Value: $6,396,285
Date of Completion: Fall 2006
CWC Contract: $6,396,285
% of Cost of Work Performed With CWC Forces: 10-20%
Project Description: The project consists of a 3-level, 126,000 sq. ft. mixed-use precast concrete parking structure to accommodate 427 parking spaces and 60,000 sq. ft. of retail space. The parking structure is intended to service the Cork Factory apartment development located in the strip district of Pittsburgh, PA. The Cork Factory is a historic industrial building originally built in 1901 and currently being redeveloped into 295 loft apartments.
View Video
2005
Carnegie Mellon University Parking Structure AdditionCategory: New Parking Structure Projects Industry: University Location: Pittsburgh, PA
Project Owner: Carnegie Mellon University, Joe Greenway, (412) 268-6823
Value: $2,200,000
Start Date: Summer 2005
Date of Completion: Fall 2005
Owners Rep: Oxford Development Corp., Chad Wheatley, (412) 261-1500
Engineer: Simpson Gumpertz & Heger Inc., (781) 907-9000
Construction Manager: Mosites Construction, Mark Edgar, (412) 923-2255
CWC Contract: $1,000,000
% of Cost of Work Performed With CWC Forces: 100%
Project Description: CWC provided a CIP P/T concrete deck for this 1-level, 68,000 sq. ft. addition to an existing steel-framed parking structure. The addition accommodated 201 parking spaces. Specifically, CWC provided all forming, reinforcing, post tensioning, and concrete placing and finishing for the project. Some remediation to the existing structure was also provided.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Project Owner: Greyhound Lines, Inc., Paul Verheyden, (214) 849-8170; Dallas,TX, Bob Troy, (214) 849-8170
Architect: IKM,Inc., Tami Green, (412) 281-1337
Value: $2,500,000+
Start Date: Spring 2005
Date of Completion: Summer 2005
Leaseholder: Pittsburgh Parking Authority, Chris Holt, (412) 560-2520
Engineer: Baker Engineering, Brad Duda, (724) 495-4090
Construction Manager: Massaro Company, Pat Stone, (412) 963-2800
CWC Contract: $1,300,000+
% of Cost of Work Performed With CWC Forces: 50%
Project Description: CWC provided a variety of construction services to relocate the Greyhound Bus Terminal to a temporary relocation facility on a surface parking lot. The scope of work included site modifications including site utility relocation, curbing and paving. The work also included coordinating the installation of a temporary modular terminal facility with loading platforms, exterior canopies, interior fit-outs, plumbing, lighting and electric requirements. The project is to be used to accommodate about 40 intercity bus arrivals and departures a day until the new permanent terminal facility is built in 2-3 years. Greyhound Lines is the owner of the facility. The Pittsburgh Parking Authority owns the land and leases it to Greyhound. PPA will also operate the new parking facility associated with the new bus terminal when it is completed.
 Category: New Parking Structure Projects Industry: Airport Location: Charleston, WV
Contact Info: Richard Atkins, Airport Director, Central WV Regional Airport Authority, (304) 344-8033
Start Date: Winter 2004
Date of Completion: Summer 2005
CWC Contract Value: $6.75 million
Project Description: New construction: 4 1/2 levels, 157,000 SF, 06 parking spaces, precast concrete structure
2004
 Category: New Parking Structure Projects Industry: Commercial Location: Farmington, PA
Contact Info: Pete Magerko, Project Director, (800) 422-2736
Start Date: Summer 2004
Date of Completion: Fall 2004
CWC Contract Value: $4.3 million
Project Description: New Construction: 4-level, 74,936 SF, cast-in-place, post-tensioned concrete decks supported by a steel frame, built into a hillside. Top level is a plaza deck to hold a 19,000 sq. ft. media center.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Contact Info: Melissa Bilec, URA Project Manager (Owner), ( 412) 255-6600
Value: $12,000,000
Start Date: Fall 2003
Date of Completion: Fall 2004
CWC Contract Value: $3,890,000 (General Contract)
Project Description: New Construction: 7-level, 340,000 SF, 868-car, prestressed, precast concrete parking structure.
 Category: New Parking Structure Projects Industry: Commercial Location: Huntington, WV
Contact Info: Davis, Tri-State Transit Authority (Owner), (304) 529-6904
Value: $8,500,000. This project is part of a 2-structure contract valued at $13,500,000.
Start Date: Summer 2003
Date of Completion: Summer 2004
Project Description: New Construction: 3-level, 250,000 SF, 390-car, prestressed, precast concrete parking structure with steel-framed shell space for a future theater on top.
 Category: New Parking Structure Projects Industry: Commercial Location: Huntington, WV
Contact Info: Paul Davis, Tri-State Transit Authority, (304) 529-6904
Value: $5,000,000. This project is part of a 2-structure contract valued at $13,500,000.
Start Date: Summer 2003
Date of Completion: Summer 2004
Project Description: New Construction: 3-level, 200,000 SF, 600-car, prestressed, precast concrete parking structure.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Contact Info: Martin Kaminski, URA Project Manager (Owner), (412) 255-6600
Value: $12,000,000
Date of Completion: Winter 2004
CWC Contract Value: $2,200,000 (General Contract)
Project Description: New Construction: 4-level, 140,000 SF, 409-car, prestressed, precast concrete parking structure.
2003
 Category: New Parking Structure Projects Industry: Government Location: Akron, OH
Contact Info: James McCarthy, County of Akron-Owner, (330) 643-2015
Value: $7,100,000.00
Date of Completion: Fall 2003
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: 2-story vertical expansion, cast-in-place concrete frame with cast-in-place, post-tensioned concrete decks with P/C concrete facade and pedestrian bridge across street to courthouse.
 Category: New Parking Structure Projects Industry: Hospital Location: Morgantown, WV
Contact Info: Robert Carubia, Assistant Vice President/WVU HSC Facilities, (304) 598-4274
Value: $2,400,000.00
Date of Completion: Summer 2003
Project Description: New Construction: Design/Build: 225-car, prestressed, precast concrete structure.
 Category: New Parking Structure Projects Industry: Commercial Location: Parkersburg, WV
Contact Info: Ann Conageski, Federal Projects Administrator, (304) 424-8418
Value: $5,088,000.00
Date of Completion: Fall 2003
Project Description: New Construction: Design/Build: 378-car, multi-story parking deck with transit offices.
 Category: New Parking Structure Projects Industry: Commercial Location: Morgantown, WV
Contact Info: Tom Arnold, Parking Authority, (304) 284-7435
Value: $4,000,000.00
Date of Completion: Fall 2003
Project Description: New Construction: 215-car, prestressed, precast concrete parking garage.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Contact Info: Melissa Bilec, URA Project Manager (Owner), (412) 255-6417
Value: $2,300,000.00
Date of Completion: Fall 2003
Project Description: New Construction: General trades package including site work, foundations and interior/exterior finishes for the URA, City of Pittsburgh. CWC was responsible for site coordination and supervision of this multiple prime contract project.
2002
 Category: New Parking Structure Projects Industry: Corporate Location: Jersey City, NJ
Contact Info: Tony Scavo, The Lefrak Organization, Owner/Developer, (718) 575-4628
Value: $2,500,000
Date of Completion: Spring 2002
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction and Construction Management: 206-car, 2-level addition to existing structure. Steel frame with CIP, post-tensioned concrete decks and P/C concrete facade treatments.
 Category: New Parking Structure Projects Industry: Government Location: Beaver County, PA
Contact Info: Ron Kretz, Baker & Associates, Architect/Engineer, (724) 495-7711
Value: $3,031,027
Date of Completion: Fall 2002
% of Cost of Work Performed With Own Forces: 30%
Project Description: New Construction: 254-car, three-story steel frame, cast-in-place, post-tensioned concrete decks with P/C concrete facade.
 Category: New Parking Structure Projects Industry: Hospital Location: Mineola, NY
Contact Info: Ralph Lambert; Axis Construction Group (Construction Manager), (631) 243-5970
Value: $9,000,000
Date of Completion: Summer 2002
Contract Value: $6,000,000
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: Design/Build: 680-car, steel frame with CIP/PT concrete deck and P/C concrete facade.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Contact Info: Tim Dittmar; Forest City Construction-Owner/Developer, (216) 416-3653
Value: $3,500,000
Date of Completion: Summer 2002
% of Cost of Work Performed With Own Forces: 40%
Project Description: New Construction: Design/Build: 00 cars, 2-story vertical expansion, steel frame with CIP/PT concrete deck and P/C concrete facade.
View the PNC Park Case Study
 Category: New Parking Structure Projects Industry: Commercial Location: Morris Plains, NJ
Contact Info: Gerry Coppola, Roseland Construction, Owner/Developer, (973) 218-2380
Value: $1,318,000.00
Date of Completion: Fall 2002
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: Design/Build: 1-level, pre-cast concrete deck.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Contact Info: Rosina Vento, Property Manager, Associated Estates Realty Corp. (Owner), (412) 391-9833
Value: $998,525.00
Date of Completion: Winter 2002
% of Cost of Work Performed With Own Forces: 20%
2001
 Category: New Parking Structure Projects Industry: Government Location: Wilkes Barre, PA
Contact Info: Tom Leonard; Pasonic Engineers, Engineer, (570) 823-4712
Value: $3,800,000
Date of Completion: Fall 2001
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: 350-car, two-story, vertical expansion, pre-stressed precast concrete parking structure.
 Category: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Architect: Rich DeYoung, WTW Architects, (412) 321-0550
Value: $23,000,000
Date of Completion: Spring 2001
Construction Manager: Rick Funk, Massaro, (412) 321-8278
V.P. Operations: Robert J. Sklarsky, (412) 963-2800
CWCG Contract Value: $2,000,000
% of Cost of Work Performed With Own Forces: 60%
Project Description: New Construction: 800-car, 8-level, prestressed, precast concrete parking structure.
View the PNC Park Case Study
2000
 Category: New Parking Structure Projects Industry: University Location: Indiana, PA
Architect: Rich DeYoung, WTW Architects, (412) 321-0550
Contact Info: Ron Wolf; Indiana University of Pennsylvania, (724) 357-2289
Value: $5,123,000
Date of Completion: Fall 2000
% of Cost of Work Performed With Own Forces: 20%
Project Description: New Construction: 417-car, prestressed, precast, free-standing concrete structure.
1999
Chatham Site Parking LotCategory: New Parking Structure Projects Industry: Commercial Location: Pittsburgh, PA
Contact Info: Bob Hicks; Parkway Corporation of Pittsburgh LP, Owner/Developer, (215) 575-4092
Value: $300,000
Date of Completion: Fall 1999
% of Cost of Work Performed With Own Forces: 10%
Project Description: Demolish existing 3-story concrete buildings and build new surface parking lot.
 Category: New Parking Structure Projects Industry: Commercial Location: Jersey City, NJ
Contact Info: Anthony Scavo, Lefrak Organization, Owner/Developer, (718) 575-4628
Value: $4,150,000
Date of Completion: Fall 1999
% of Cost of Work Performed With Own Forces: 40%
Project Description: Design/Build: 2-floor vertical expansion, (147,000 sq. ft.) steel frame, P/T concrete.
1998
 Category: New Parking Structure Projects Industry: Corporate Location: Wayne, PA
Contact Info: Jim Lutz; Liberty Property Trust, Owner/Developer, (610) 648-1759
Value: $2,000,000
Date of Completion: Fall 1998
% of Cost of Work Performed With Own Forces: 10%
Project Description: Design/Build: 235-car, prestressed, precast concrete structure.
1997
 Category: New Parking Structure Projects Industry: Corporate Location: Corning, NY
Contact Info: Ralph Ely, Corning Incorporated, Owner/Developer, (607) 974-8371
Value: $3,500,000
Date of Completion: Fall 1997
% of Cost of Work Performed With Own Forces: 25%
Project Description: Design/Build: 500-car, prestressed, precast concrete structure.
 Category: New Parking Structure Projects Industry: Government Location: Hollidaysburg, PA
Contact Info: Blaise Michaels; Blair County Commissioners, Owner, (814) 693-3025
Value: $2,000,000
Date of Completion: Fall 1997
% of Cost of Work Performed With Own Forces: 20%