Government
2008 | 2007 | 2006 | 2003 | 2002 | 2001 1997
2008
 Category: New Parking Structure Projects Industry: Government Location: Pittsburgh, PA
Project Owner: Urban Redevelopment Authority of Pittsburgh
Architect: Indonvina Associates
Type of Assignment: Design/Build
Capacity: 726 cars
Value: $10.5 million
Start Date: Winter 2008
Date of Completion: Fall 2008
Project Description: View News Release
2007
 Category: New Parking Structure Projects Industry: Government Location: Washington, PA
Project Owner: Mr. Bob Griffin, Redevelopment Authority, Director of Construction Management of the County of Washington (RACW), (724) 228-6875
Architect: Mr. Rob Indovina, Indovina Associates Architects, (412) 363-3800
Value: $11,795,809
Start Date: Spring 2006
Date of Completion: Spring 2007
CWC Contract: $11,795,809
Project Description: This 250,000 sq. ft. (180,000 sq. ft. supported), precast concrete parking structure is intended to provide 850 parking spaces to support a major multi-use downtown redevelopment project for the city of Washington, PA central business district. Significant architectural design features include the use of brick-faced panels at prominent locations and expansive use of glass in the stair elevator towers. Carl Walker Construction (CWC) was awarded the project on a design/build basis through a formal competition that evaluated proposals on a two-part evaluation: 1) how effectively defined design criteria were met and 2) price. Points were awarded on an equal-weight basis for each category, with the project awarded to the proposal with the most total points. CWC won both categories and was awarded the project.
View Case Study
View Video
2006
 Category: New Parking Structure Projects Industry: Government Location: Fairmont, WV
Project Owner: City of Fairmont, WV, Jay Rogers (304) 367-0490
Architect: Omni Associates, Steve Barnum (304) 367-1417
Value: $3,500,000
Start Date: Summer 2005
Date of Completion: Spring 2006
Engineer: Stroud, Pence & Associates, Ed Pence
CWC Contract: $3,500,000
% of Cost of Work Performed With CWC Forces: 10%
Project Description: The project is a 3-level (grade plus 2 supported levels), pre-cast concrete parking structure which provides 225 parking spaces. The project has approximately 50,000 sq. ft. of structural area and an additional 20,000 sq. ft. of area on grade for a total area of approximately 70,000 sq. ft. The project entailed extensive use of thin-set brick panels and expansive glass in the main stair/elevator enclosure as its primary architectural features.
 Category: New Parking Structure Projects Industry: Government Location: Pittsburgh, PA
Architect: Indovina Associates Architects, Brian Roth, (412) 363-3800 and Rob Indovina, (412) 363-3800
Value: $15,000,000
Start Date: Fall 2005
Date of Completion: Fall 2006
Construction Manager: Zambrano Corporation, Brad Smith, (412) 968-5400
CWC Contract: $2,670,000
Project Description: The project consisted of a new exhibit area for polar bears, walruses and sea otters with adjacent facilities for related equipment and support staff. CWC work included providing the CIP concrete structural frame for the enclosure buildings and the concrete pools, tanks and perimeter walls for the exhibit area and adjacent facilities. Architectural finishes are by others. Scope of work consists of 14,000 sq. ft. of supported structural area, 53,000 sq. ft. of perimeter wall area, plus various tanks and pools.
2003
 Category: New Parking Structure Projects Industry: Government Location: Akron, OH
Contact Info: James McCarthy, County of Akron-Owner, (330) 643-2015
Value: $7,100,000.00
Date of Completion: Fall 2003
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: 2-story vertical expansion, cast-in-place concrete frame with cast-in-place, post-tensioned concrete decks with P/C concrete facade and pedestrian bridge across street to courthouse.
2002
 Category: New Parking Structure Projects Industry: Government Location: Beaver County, PA
Contact Info: Ron Kretz, Baker & Associates, Architect/Engineer, (724) 495-7711
Value: $3,031,027
Date of Completion: Fall 2002
% of Cost of Work Performed With Own Forces: 30%
Project Description: New Construction: 254-car, three-story steel frame, cast-in-place, post-tensioned concrete decks with P/C concrete facade.
2001
 Category: New Parking Structure Projects Industry: Government Location: Wilkes Barre, PA
Contact Info: Tom Leonard; Pasonic Engineers, Engineer, (570) 823-4712
Value: $3,800,000
Date of Completion: Fall 2001
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: 350-car, two-story, vertical expansion, pre-stressed precast concrete parking structure.
1997
 Category: New Parking Structure Projects Industry: Government Location: Hollidaysburg, PA
Contact Info: Blaise Michaels; Blair County Commissioners, Owner, (814) 693-3025
Value: $2,000,000
Date of Completion: Fall 1997
% of Cost of Work Performed With Own Forces: 20%
Project Description: New Construction: 200-car, prestressed, precast concrete structure.
|